Dropped Kerb Guide

Dropped kerbs in Essex County Council: fee, who builds it and how to apply

Everything you need to apply for a dropped kerb (vehicle crossing) with Essex County Council, from the council's own website. Last checked 3 October 2026.

Homeowner application fee£210.18Essex Highways 2026 fee schedule, checked 3 Oct 2026
Total council fees£360.18Application fee plus other published council fees. Building it costs extra.
Who builds itAny qualified contractorYour own qualified contractor
Decision timeSeveral weeks after consent
Permission valid for6 months

Apply for initial consent (Essex Highways)

Check you have the right council. Essex County Council doesn't cover every address in the area. These neighbouring places have their own highway authority, with different fees and rules: Southend-on-Sea City Council; Thurrock Council. Check your postcode.

Who builds dropped kerbs in Essex?

Essex uses a two-stage process. You apply for consent; your chosen contractor then books the road space and builds the crossing. You may choose any suitably qualified contractor. Essex does not keep an approved list, but it checks the contractor's details before they may work on the highway and can refuse a contractor it considers not competent.

How much does a dropped kerb cost in Essex?

Homeowner application fee: £210.18. Non-refundable initial application fee (covers the site visit, a search for underground apparatus and admin). If approved, your contractor pays £150 for the Road Opening Notice. Vehicle crossing fees carry no VAT.

Road Opening Notice (paid by your contractor): £150

Total council fees: £360.18 (construction not included).

Building it: Essex doesn't publish a typical construction price. Councils that do publish prices quote roughly £1,000 to £3,500 for a standard crossing.

Estimate your total for Essex with the calculator

Contractor requirements in Essex

How to check street works cards and insurance before you hire: our guide to dropped kerb contractors.

How to apply in Essex

  1. Check the criteria: a parking space at least 5 m deep (at about right angles to the road) by 2.5 m wide.
  2. Get planning permission first if you are on a classified road (A, B or Class III), and check local conditions such as covenants with your district council.
  3. Apply online for initial consent with a measured plan, any planning permission and the owner's written consent, and pay £210.18.
  4. Essex inspects, then requests details of underground utilities (a 'stats request'); the application is on hold until that comes back.
  5. Your contractor books the road space with a Road Opening Notice (£150) and builds the crossing within 6 months of approval.
  6. An inspector checks the finished crossing a few weeks later; the contractor fixes any defects.

How long it takes

Size and siting rules

Good to know

Ready to apply in Essex?

Check your property qualifies and have everything ready, then apply on the council's own website.

Apply for initial consent (Essex Highways) Eligibility checker Printable checklist

Nearby councils

Other neighbouring councils we haven't checked yet (official links): Enfield, Havering, Redbridge, Waltham Forest.

Dropped kerb guides